AssetAvenue Studies
As-of-right feasibility studies
The largest building a lot allows without a rezoning or variance: drawn to scale, checked provision by provision against the zoning by-law and against the 2024 Ontario Building Code.
- Format
- 17 × 11 PDF
- Full package
- 21 sheets
- Delivery
- 2–12 business days
- Coverage
- Ottawa · Toronto
Studies
| Zoning memo$950CAD, before tax | As-of-right study$2,900CAD, before tax | Full feasibility package$3,900CAD, before tax | |
|---|---|---|---|
| Delivery | 2 business days | 7 business days | 12 business days |
| Revisions included | — | 1 | 1 |
| FS-000Cover | |||
| FS-001Project summary | |||
| FS-002Zoning compliance | |||
| FS-003Building code review | |||
| FS-101Site plan | |||
| FS-102Parking level | |||
| FS-103–105Floor plans | |||
| FS-201Street elevation | |||
| FS-202Building section | |||
| FS-301–304Ramp proof | |||
| FS-401–405Assemblies, structure, mechanical, fire | |||
| FS-501Exterior render |
Zoning memo: the compliance table for every provision, with unit mix, gross and net area and parking, as a signed memo.
Add-ons
| Exterior render. One photoreal still of the scheme on its street, from the study's own model. Included in the full package. | $650 | As-of-right study |
| Second scheme. A second building drawn and tested: a minor variance case, a rezoning to precedent height, or an assembly with a neighbour. | $1,200 | As-of-right study, Full feasibility package |
| Pro forma. Rent and sale cases, hard and soft costs, development charges, and returns for the scheme, as a spreadsheet. | $350 | Zoning memo, As-of-right study, Full feasibility package |
| Rush. Half the turnaround, from the day the lot is confirmed as studyable. | +35% of the study | Zoning memo, As-of-right study, Full feasibility package |
What the full package contains
General
FS-000Cover. Street elevation drawn to the height limit, render where supplied, headline figures
FS-001Project summary. Lot data, unit mix by level, findings, items to confirm, program decisions
FS-002Zoning compliance. Every provision: requirement, proposed, by-law section, status
FS-003Building code review. 2024 OBC matrix: classification, exits, fire separations, barrier-free
Site and plans
FS-101Site plan. Setbacks, soft landscaping, waste route, exits to a street
FS-102Parking level. Stalls, columns, aisles, vestibules (when the program includes a garage)
FS-103–105Floor plans. Every level, metric and imperial, unit areas, exits
Elevation and section
FS-201Street elevation. True height against the zoning limit
FS-202Building section. Grade, measured height and margin, basement test
Parking and ramp
FS-301–304Ramp proof. Swept path with a full-size pickup, headroom under all structure, no beams over stalls
Building systems (concept)
FS-401–405Assemblies, structure, mechanical, fire. Concept systems sized to the scheme, with concrete quantities
Render
FS-501Exterior render. Photoreal still of the scheme on its street, from the study model (add-on with the as-of-right study)
How it works
- 1Pick the lot and pay. From the Develop map or by address. Choose the study and your program preferences: parking, rooftop terrace.
- 2Lot check. Zoning, parcel geometry and your uploads are reviewed before work starts. If the lot can't be studied, the order is refunded.
- 3Study. Program decided from the by-law, scheme drawn to scale, every figure computed from one model and checked.
- 4Delivery. The PDF lands on your order page, with one revision on the as-of-right and full studies.
What a study is not
- A feasibility study tests what the zoning allows and estimates yield. It is not an architectural or engineering design and cannot be used for a permit, tender or construction.
- Zoning readings marked “confirm” need a municipal zoning determination. Building code, structural, mechanical and fire content is conceptual.
- Survey, geotechnical, heritage and servicing information is not independently verified.
- Turnaround runs from the day the lot is confirmed as studyable; rush halves it. One revision is included on the as-of-right and full studies.
- If the lot cannot be studied (missing data, outside a covered municipality), the order is refunded in full.
Order a study
Questions
- Which lots can you study?
- Ottawa and Toronto lots under their current zoning by-laws. Other Ontario municipalities on request before ordering.
- Do I need a survey?
- No. The lot comes from municipal parcel data. A survey, if you have one, makes setbacks and areas exact; upload it on your order page.
- Can I use the study for a permit?
- No. It shows what the zoning allows and what fits. A permit set is drawn and sealed by an architect and engineers, and the study is the brief they start from.
- What if the by-law needs an interpretation?
- It is marked “confirm” on the compliance table and listed in the summary, so it can go to a zoning determination or pre-consultation.